Journal Publications
- Y.A. Sari, M. Kumral. (2019). “A planning approach for poly-metallic mines using sublevel stoping technique with pillars and ultimate stope limits”, Engineering Optimization, in press.
- S. Li, Y.A. Sari, M. Kumral. (2019). “New approaches to cognitive work analysis through latent variable modeling in mining operations”, Journal of Mining Science and Technology, in press.
- Y.A. Sari, M. Kumral. (2018). “A landfill based approach to surface mine planning”, Journal of Central South University, 25(1), 159–168.
- Y.A. Sari, M. Kumral. (2018). “Dig limit optimization through mixed integer linear programming in open pit mines”, Journal of the Operational Research Society, 69(2), 171–182.
- M. Kumral, Y.A. Sari. (2017). “Simulation-based mine extraction sequencing with chance constrained risk tolerance”, SIMULATION, 93(6), 527–539.
- L. St-Pierre, Y.A. Sari, M. Kumral. (2017). “Creation of Histograms for Data in Various Mineral Resource and Engineering Problems”, Natural Resources Research, 26(2), 201–212.
- M. Kumral, Y.A. Sari. (2017). “An application of possibilistic programming to production sequencing of mining parcels”, International Journal of Management Science and Engineering Management, 12(2), 79–88.
- Y.A. Sari, M. Kumral. (2016). “A new heuristic memory-based simulated annealing approach applied to mine production scheduling problem”, International Journal of Applied Decision Sciences, 9(4), 348– 365.
- Y.A. Sari, M. Kumral. (2016). “An improved meta-heuristic approach to extraction sequencing and block routing”, Journal of the Southern African Institute of Mining and Metallurgy, 116(7), 673–680.
- Y.A. Sari, M. Kumral. (2015). “Mine Production Scheduling For Poly-Metallic Mineral Deposits: Extension to Multiple Processes”, International Journal of Planning and Scheduling, 2(2), 134–153.
Conference papers:
- Y.A. Sari, M. Kumral, “Incorporating grade uncertainty into sublevel stope sequencing”, APCOM, June 4-6 2019, Wroclaw PL
- S. Li, Y.A. Sari, M. Kumral, “A spatial clustering algorithm for orebody classification and boundary setting”, APCOM, June 4-6 2019, Wroclaw PL
- Y.A. Sari, M. Kumral, “A new approach to underground stope layout optimization”, IMCET, April 11-14 2017, Antalya TR
- Y.A. Sari, N. Germain, M. Kumral, “Short-Term production planning for multi-metal open-pit mines with equipment size constraints”, IMCET, April 11-14 2017, Antalya TR
- Y.A. Sari, M. Kumral, “Optimal Mine Extraction Sequencing Using Meta-heuristics”, IMCET, April 14-17 2015, Antalya TR
Conference presentations:
- Y.A. Sari, M. Kumral, “A new dimension reduction and optimization approach to stope layout planning”, AIMS, May 23-24 2018, Aachen DE
- Justin Mak, Y.A. Sari, M. Kumral, “Optimal process design facilitation for mining operations”, AIMS, May 23-24 2018, Aachen DE
- Y.A. Sari, M. Kumral, “Waste Management Strategy through Mine Production Scheduling”, EurAsia Waste Management Symposium, May 2-4 2016, Istanbul TR
- Y.A. Sari, M. Kumral, “A Machine Learning Approach to Mine Production Scheduling” Poster Pre- sentation, CIM Convention, May 9-13, Montreal QC
- M. Kumral, Y.A. Sari, “Mine extraction sequencing through fuzzy optimization”, CIM Convention, September 11-13 2014, Sept-Iles QC
- M. Kumral, Y.A. Sari, “Multi-destination mine planning for poly-metallic mineral deposits”, CIM Convention, May 11-14 2014, Vancouver BC